EPB3200 Earth Pressure Balance Pipe Jacking Machine | Application in Hefei Anhui Jinzhai Road Intercepting Regulating Pipe Network Project
Release time:
2026-07-18
Construction Location:Hefei , Anhui ( Jinzhai Road Intercepting and Regulating Pipe Network Project)
Selected Equipment: EPB3200 Earth Pressure Balance Pipe Jacking Machine
Project Features: The total length of the project is approximately 3.29 km, with pipe jacking construction adopted throughout. The main construction includes 14 working shafts, 8 receiving shafts, and 3 newly built intercepting shafts. The pipe jacking materials consist of ductile iron pipes and PCCP. The pipeline passes under roads at 2 locations and crosses under the Shiwuli River at 6 locations along its route.