EPB3200 Earth Pressure Balance Pipe Jacking Machine | Application in Hefei Anhui Jinzhai Road Intercepting Regulating Pipe Network Project


Release time:

2026-07-18

EPB3200 Earth Pressure Balance Pipe Jacking Machine | Application in Hefei Anhui Jinzhai Road Intercepting Regulating Pipe Network Project

Construction Location:Hefei , Anhui ( Jinzhai Road Intercepting and Regulating Pipe Network Project) 
Selected Equipment: EPB3200 Earth Pressure Balance Pipe Jacking Machine
Project Features: The total length of the project is approximately 3.29 km, with pipe jacking construction adopted throughout. The main construction includes 14 working shafts, 8 receiving shafts, and 3 newly built intercepting shafts. The pipe jacking materials consist of ductile iron pipes and PCCP. The pipeline passes under roads at 2 locations and crosses under the Shiwuli River at 6 locations along its route.

Label:

Yangzhou Dilong Machinery Co., Ltd.

More than ten years of experience in the design and manufacturing of pipe jacking machines

全部
  • 全部
  • 产品管理
  • 新闻资讯
  • 介绍内容
  • 企业网点
  • 常见问题
  • 企业视频
  • 企业图册