Language
aoyang aoyang

Project

/
/
Construction site drawing of the west extension high-voltage line of Jinshui Road, Zhengzhou

Construction site drawing of the west extension high-voltage line of Jinshui Road, Zhengzhou

  • Categories:Engineering case
  • Author:
  • Origin:
  • Time of issue:2020-02-12 10:12
  • Views:

(Summary description)

Construction site drawing of the west extension high-voltage line of Jinshui Road, Zhengzhou

(Summary description)

  • Categories:Engineering case
  • Author:
  • Origin:
  • Time of issue:2020-02-12 10:12
  • Views:
Information

The construction site map of the west extension high-voltage line of Jinshui Road in Zhengzhou City. At this time, the jacking has been 320 meters, each section is 450-500 meters, and the jacking is 3300 meters.

郑州市金水路西延高压线施工现场图,此时已顶进320米,每段450米-500米,共顶进3300米。

郑州市金水路西延高压线施工现场图,此时已顶进320米,每段450米-500米,共顶进3300米。

Contact Information

E-mail:hannah@yzdilong.com

Address: Wujian Industrial Park, Jiangdu District, Yangzhou City, Jiangsu Province,China

Tel: +86 13852589366 / +86 13390658976

You can share with everyone