News:NPD930 Retractable Slurry Balance Pipe Jacking Machine Deployed for Nanjing South Tunnel Crossing Shuanglong Avenue


Release time:

2026-07-25

News:NPD930 Retractable Slurry Balance Pipe Jacking Machine Deployed for Nanjing South Tunnel Crossing Shuanglong Avenue

Construction site: Nanjing South Tunnel Crossing Shuanglong Avenue   

Equipment: NPD930 retractable Slurry  balance pipe jacking machine  

Engineering features: No receiving shaft, using retractable equipment When encountering soil layers and sandstone, a copying knife was used. There are two types of rock folding disc cutters.

Label:

Yangzhou Dilong Machinery Co., Ltd.

More than ten years of experience in the design and manufacturing of pipe jacking machines

全部
  • 全部
  • 产品管理
  • 新闻资讯
  • 介绍内容
  • 企业网点
  • 常见问题
  • 企业视频
  • 企业图册