Under what circumstances will you choose a pipe jacking machine for construction?


Release time:

2020-09-10

Under what circumstances will you choose a pipe jacking machine for construction? Under what circumstances would you choose excavation?Where the geological conditions are good and the depth is less than 4 meters, the pipe jacking machine generally adopts excavation construction.

Under what circumstances will you choose a pipe jacking machine for construction?

Under what circumstances will you choose a pipe jacking machine for construction? Under what circumstances would you choose excavation?

 

Where the geological conditions are good and the depth is less than 4 meters, the pipe jacking machine generally adopts excavation construction. Shallow pipelines are excavated faster, and they can be dug at night and backfilled in the morning, and then covered with steel plates, without affecting traffic much. If the pipeline is deep, in order to prevent landslides, a certain slope is required for excavation, which will have a greater impact on traffic. If the ground is a quicksand layer and soil with strong water permeability, it is also prone to landslides and is not suitable for excavation.
   

How thick is the sewage pipe for pipe jacking construction? What material is it made of? The inner diameter is generally above 600 mm. Firstly, the sewage discharge capacity of the main road is generally relatively large. Secondly, if the pipe diameter is too small, it is impossible to install a muddy water return pipe in the pipe. Some of the sewage pipes are PE pipes made of synthetic materials, and some are reinforced concrete pipes. The pipe jacking construction is all reinforced concrete pipes, the thickness of the pipe wall is more than 6 cm, and the mouth of the pipe is equipped with a protective steel ring, which will not be damaged by the jacking. A section of reinforced concrete sewage pipe generally weighs about two tons. Jacks are used to jack up sewage pipes, and multiple jacks can be used at the same time according to needs, and the jacking force can generally reach about 20 tons.
   

The construction of pipe jacking machine can effectively solve the problem of quicksand layer and strong soil water permeability, and the construction impact area is small. However, pipe jacking is not suitable for pipes with a soil cover of less than 4 meters, because pipe jacking may cause ground arching. In addition, considering ventilation and other reasons during construction, pipe jacking construction generally requires digging a work well every 200 meters or so, and the pipe jacking construction between two work wells generally takes 2-3 months.

Label:

Yangzhou Dilong Machinery Co., Ltd.

More than ten years of experience in the design and manufacturing of pipe jacking machines

全部
  • 全部
  • 产品管理
  • 新闻资讯
  • 介绍内容
  • 企业网点
  • 常见问题
  • 企业视频
  • 企业图册